We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren

M7 Metro Line Oruç Reis Station

25.02.2022
11.184 view
M7 Metro Line Oruç Reis Station
Location
  • Esenler / İstanbul
The Work Done
  • Installation and commissioning works of LVS (Main Distribution), Subsidiary, Mechanical Panels
  • High current, lighting-socket electrification processes
  • Cable duct installation operations
  • Administrative testing and commissioning operations
  • Mechanical system control wiring and commissioning operations
  • Weak current operations
Reference Images