We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren

Birkim Textile Dye Chemistry

23.02.2022
10.805 view
Birkim Textile Dye Chemistry
Location
  • Ergene / Tekirdağ
The Work Done
  • 1600 kVA Substation installation
  • LV Distribution, meter and compensation panel installation
  • Factory building high current, weak current, lighting and electrification operations
  • Administrative building high current, weak current, lighting and electrification operations
  • Engineering services
Reference Images