Formül Plastic

23.02.2022
10.337 view
Formül Plastic
Location
  • Çerkezköy / Tekirdağ
The Work Done
  • 850 m² of office space and 6400 m² of production area are available.
  • 1600 kVA transformer and 2500A busbar installation
  • Lighting busbar and high ceiling luminaire installation
  • Environmental lighting facade lighting
  • Fire detection system installation, testing and commissioning
  • Data and CCTV system installation and commissioning
  • Assembly and replacement of main distribution and MCC load panels