We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren
23.02.2022
10.524 view
Starax Factory
Location
  • Ergene / Tekirdağ
The Work Done
  • 1250 kVA LV switchgear installation and installation
  • 1250 kVA main distribution and compensation panel installation
  • Busbar transmission line installation
  • Factory high current, low current, lighting and electrification operations
Reference Images