Starax Factory
Location
- Ergene / Tekirdağ
The Work Done
- 1250 kVA LV switchgear installation and installation
- 1250 kVA main distribution and compensation panel installation
- Busbar transmission line installation
- Factory high current, low current, lighting and electrification operations
Reference Images