We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren
23.02.2022
10.604 view
Karbosan
Location
  • Çerkezköy / Tekirdağ
The Work Done
  • 60,000 m² total area, 2×2500 kVA facility power
  • Main distribution panels, meter panels, secondary panels, busbar line all high current electrification works
  • All electrification works of fire detection, alarm, emergency announcement, cctv low current systems
  • Engineering services
Reference Images