We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren
18.02.2022
10.402 view
Hidroser
Location
  • Kıraç, Büyükçekmece / İstanbul
The Work Done
  • 800 kVA H.G. switchgear assembly and installation
  • 800 kVA main distribution and compensation panel installation and commissioning
  • 25 A – 250 A Busbar transmission line installation
  • Factory high current, low current, lighting and electrification operations
  • Engineering services
Reference Images