We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren

İnteks Textile

18.02.2022
10.274 view
İnteks Textile
Location
  • Çerkezköy / Tekirdağ
The Work Done
  • 1600 kVA H.G. switchgear assembly and installation
  • 1600 kVA main distribution and compensation panel installation
  • 400 A – 1000 A Busbar transmission line installation
  • Factory high current, low current, lighting and electrification operations
  • Engineering services
Reference Images