Mizan Packaging
Location
- Kıraç, Büyükçekmece / İstanbul
The Work Done
- 2000 kVA H.G. switchgear assembly and installation
- 2000 kVA main distribution and compensation panel installation
- Factory high current, low current, lighting and electrification operations
- Engineering services
Reference Images