We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren

Pireks Copper Alloys

18.02.2022
10.595 view
Pireks Copper Alloys
Location
  • Hadımköy / İstanbul
The Work Done
  • 2500 kVA H.G. switchgear assembly and installation
  • 2500 kVA main distribution and compensation panel installation
  • 630 A – 4000 A Busbar transmission line installation
  • Factory high current, low current, lighting and electrification operations
  • Engineering services
Reference Images