Sea Pearl
Location
- Ataköy / İstanbul
The Work Done
- East Phase – 2 blocks 389 flats, West Phase – 2 Blocks 342 flats, West Phase 4-storey residential car park
- Turnkey construction of all high current and low current electrification operations of the flats and parking lot
- High current electrification works of main distribution panels, meter panels, secondary panels, busbar line etc.
- All electrification works of fire detection, alarm, emergency announcement, cctv, intercom low current systems
- Engineering services
Reference Images