Çelikler Aluminum
Location
- Hadımköy / İstanbul
The Work Done
- 2500 kVA H.G. switchgear assembly and installation
- 2500 kVA main distribution and compensation panel and installation
- Factory high current, low current, lighting and electrification operations
- Engineering services
Reference Images