Günöz Textile
Location
- Velimeşe, Çorlu / Tekirdağ
The Work Done
- 2000 kVA H.G. switchgear assembly and installation
- 2000 kVA main distribution and compensation panel and installation
- 1000 kVA main distribution and compensation panel and installation
- 1000 kVAr harmonic filtration panel and installation
- 1450 kW cogeneration system installation and commissioning
- 630 A – 1000 A busbar transmission line installation
- 600 kW PLC based load shedding automation system
- Factory high current, low current, lighting and electrification operations
- Engineering services