Star Steel
Location
- Selimpaşa, Silivri / İstanbul
The Work Done
- 1000 kVA H.G. switchgear assembly and installation
- 1000 kVA Main distribution and compensation panel installation and commissioning
- 25 A – 630 A Busbar transmission line installation
- Factory high current, low current, lighting and electrification operations
- Engineering services
Reference Images