Orego Packaging

23.02.2022
10.580 view
Orego Packaging
Location
  • Esenyurt / İstanbul
The Work Done
  • 40.000 m2 total area, 2×1600 + 1600 + 800 kVA facility power
  • High current electrification works of main distribution panels, meter panels, secondary panels, busbar line etc.
  • All electrification works of low current systems such as fire detection, alarm, emergency announcement, cctv etc.
  • Engineering services