Hakan Plastic
Location
- 2. Org. San. Sit. / Şanlıurfa
The Work Done
- 2×2500 kVA switchgear installation and generator Scada control installation
- Main distribution and compensation panel installation
- Busbar transmission line installation
- Factory high current, low current, lighting and electrification operations
Reference Images