We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren
18.02.2022
10.232 view
Cüno Textile
Location
  • Yenibosna / İstanbul
The Work Done
  • 2500 kVA power busbar, AYD busbar installation
  • LV distribution, meter and compensation panel installation
  • Factory high current, low current, lighting and electrification operations
  • Engineering services
Reference Images