We are as close as a phone call
0 212 872 08 08
Language
tren
Language
tren
21.08.2023
343 view
Talu Textile
 
Location
  • Bağcılar / İstanbul
 
The Work Done
  • 16.000 m² total area 630 kVA Facility Power MV Distribution – Transformer Installation
  • 750 kVA Generator Installation
  • Main Distribution Panels and All Subsidiary Panels
  • Building Lighting, Socket, LV Distribution, Bus-Bar Distribution, Mechanical Distribution etc. All Electrification Works of High Current Systems
  • Fire Detection, Emergency Alarm, Card Access, TV, Lighting Automation, Mechanical Automation, CCTV, DATA etc. All Electrification Works of Weak Current Systems
  • Cable Duct Installation Works
  • Grounding Distribution and Lightning Rod Installation
  • Equipment Installations of All Systems
  • Testing and Commissioning Works of All Systems
 
Reference Images